The Upstairs
So, the remodel is mostly done, and Kristi's parents are our beta testers this Christmas. We still have lots of detail work to do, plus general decorating (rugs, pictures, etc.). But it works.Looking down the stairs from the landing, you can see the new maple treads. You can also see the masking tape on the treads and wall, because I haven't finished painting the stair skirting. Kristi textured the stairway walls, and they look great.
So, once on the landing, you can take in most of the space. The front alcove is to the left, with a table for games, puzzles, etc. Barely visible behind the baluster in the middle of the picture is our new 42" LCD TV, which will ultimately mount on the wall above where it's currently sitting. To the right of that is the gas stove, which does a great job of heating the room.
Coming off the stairs, now you can see the built-in bed, as well as the new armoire, couch, gliders and tables.
I'm kind of proud of the bed. Much of the work upstairs was contracted out, but I did everything on the bed except the drywalling, from the framing on. I built the drawer faces to match the cabinetry in the bathroom.
Speaking of the bathroom: the shower glass looks pretty good.
So does the rest of it.
Labels: home
<< Home